Highlights
- Phoenix Sky Harbor's Destination PHX 2050 program targets capacity for 90 million passengers annually by 2050.
- A future West Terminal would be the airport's first new terminal since Terminal 4 opened in 1990, with a potential 2033 opening.
- American Airlines, which serves more than 40% of Sky Harbor passengers, will be the primary carrier for the new terminal.
- The project will be funded through passenger facility charges, bonds, and airport funding, with no local tax dollars.
Phoenix Sky Harbor International Airport is moving forward with Destination PHX 2050, a long-term development program designed to grow the airport's capacity to serve up to 90 million passengers a year by 2050, according to the Greater Phoenix Chamber.
The centerpiece is a future West Terminal, which will be built on the west side of Sky Harbor. The terminal will be the airport's first new terminal since Terminal 4 opened in 1990 and is designed to serve as the main entry point for growing international travel, with capacity for additional wide-body aircraft. American Airlines, which serves more than 40% of all passengers at Phoenix Sky Harbor, will be the primary carrier for the new terminal. The number of gates and final design features are still being developed. Construction could potentially begin in late 2029 with an opening in late 2033.
The project will be funded with passenger facility charges, bonds, and airport funding. No local tax dollars will be used.
Two additional projects are already under construction. Taxiway U, an aircraft taxiway connecting the north and south airfields near the airport's west entrance, is designed to improve aircraft movement and airfield efficiency. A Terminal 3 New North Concourse, a six-gate addition, will add capacity and updated amenities. Sky Harbor is also investing in Terminal 4 upgrades covering the baggage system, concessions, and building infrastructure.
The city of Phoenix confirmed American Airlines as the primary carrier for the West Terminal in a September announcement, with Aviation Pros reporting the project is valued at $4.5 billion.
Full program details are available at destinationphx2050.com. A final gate count and design are expected as planning continues.
Sources
Every factual claim in this article traces to one of the sources below. See how we work for the editorial process.
- phoenixchamber.com retrieved 06/10/2026 20:10
- aviationpros.com retrieved 06/10/2026 20:10
Authored by The Scottsdale Signal. Drafted by AI from primary-source material under our beat-specific editorial guides; reviewed by humans before publish under our five-gate process. Sources retrieved at 06/10/2026 20:10. Every claim traces to a source.